Shelduck - Thu 12 Dec The Rig
Thu 12 Dec 14:57.511N 48:00.025W Distance travelled in 24h 147 miles.
Brendan is well experienced now in moving the two genoas from reaching to
running. To go from reaching to running the jib sheet and the lazy/back up jib
sheet have both to be moved out of the amidships deck tracks to outside the
stantions and the jib sheets put through the blocks at the ends of the twin
spinnaker booms. This involves clambering about very carefully on the plunging
foredeck, safety line clipped to the jackstays.
We learned of the need for these blocks at one of the ARC seminars in Grand
Canaria. On the passage down from Lagos to Lanzarote we had badly damaged the
jib sheets by chafe as they ran directly through the pole ends. Thankfully we
have no sign of chafe up to now with this new
arrangement.
Previous
|
Next